Brief
To provide access over an artificial waterway beneath a glass enclosed walkway for repair work at the hotel. The structure was not to pollute the water.
Solution
A 23m temporary jetty made with aluminum frames and legs.
Challenges
The main challenge was the limited access. All the components had to be carried through hotel corridors, so we used lightweight aluminum modular frame sections with detachable aluminum legs and pre-made removeable decking panels for easier installation.

.jpg)